Peach Tree Connector and Water Quality Basin Project

    This project will connect Peach Tree Drive/Peach Tree Court to the platted Aurora Drive, which will then connect to West Nifong Boulevard at a signalized intersection. Included in this project is the design of a water quality basin.

    IP Meeting:

    The City of Columbia Public Works Department hosted an informal Open House informational meeting concerning the Peach Tree Connector and Water Quality Basin Project on Tuesday, March 17, 2015 from 5:30 P.M. to 7:00 P.M. at the Gentry Middle School, 4200 Bethel Street, Columbia, MO. The meeting took take place in the Media Center.  The purpose of this meeting was to present design concepts for a connection to Peach Tree Drive/ Peach Tree Court that will be established from the platted Aurora Drive, which will then connect to West Nifong Boulevard at a signalized intersection. Design concepts will also be presented for the installation of water quality features.

    Project Coordinator: Lee White, P.E.

    IP Meeting Display Materials: