Chip Seal 2019

chip seal

City of Columbia Public Works Street Division crews chip sealed 41 streets in 2019. 

Chip sealing uses the same ingredients as asphalt. A thin film of heated asphalt liquid is sprayed on the road surface, followed by the placement of small “chips” or stones. Rollers then go over the chips to compact and adhere them to the existing asphalt. The excess stone is swept from the surface after a period of time to allow the chips to dry and settle. 

The chip seal process typically costs $1-$2 per square yard. By comparison, mill and overlay costs between $7 and $10 per square yard. This means that a typical 1,000-foot residential street would cost $5,000 to chip seal but more than $25,000 to mill and overlay. If pavement maintenance were ignored altogether, total reconstruction of the street could cost more than $200,000. Chip seal prevents road deterioration by sealing up cracks and providing a pliable long-term wearing surface that can typically last 5-7 years.

Street

From

To

Status

Butterfield Court

Cumberland Road

north end

Completed

Cumberland Road

Greenbriar Drive

Skylark Drive

Completed

Conestoga Court

Cumberland Road

north end

Completed

Trail Ridge Drive

Cumberland Road

Belinda Court

Completed

Overland Court

Trail Ridge Drive

west end

Completed

Berwick Court

Kirkdale Drive

east end

Completed

West Walnut Street

Aldeah Avenue

Bicknell Street

Completed

Bicknell Street

West Walnut Street

West Ash Street

Completed

Broadhead Street

West Boulevard

Northeast end

Completed

Meadow Lane

Anderson Avenue

Ash Street

Completed

Walnut Court

West Boulevard

northeast end

Rescheduled for 2020

Pearl Avenue

Pershing Road

west end

Completed

Tipton Terrace

East Briarwood Lane

Rockingham Drive

Completed

West Briarwood Lane

West Broadway

Evans Road

Completed

Patsy Lane

Spencer Avenue

Hunt Avenue

Completed

Pennant Street

West Worley Street

Hunt Court

Completed

Jean Rae Drive

Rowe Lane

concrete

Completed

Pannell Street

Business Loop 70 East

Wilkes Boulevard

Completed

Taft Street

Gordon Street

Monroe Street

Completed

Moss Street

Gordon Street

McAlester Street

Completed

Gordon Street

Paris Road

Charles Street

Completed

Rockhill Road

Cliff Drive

Hilltop Drive

Completed

Hawthorn Drive

Cliff Drive

Rockhill Road

Completed

Cliff Drive

University Avenue

Hilltop Drive

Completed

Queen Ann Drive

Old U.S. 63 South

Shepard Boulevard

Completed

Woodridge Drive

I-70 Drive Southeast

Lansing Avenue

Completed

Woodridge Court

Woodridge Drive

east end

Completed

Murfreesboro Drive

North Grace Lane

Port Way

Completed

Volunteer Drive

North Grace Lane

Younger Drive

Completed

Younger Drive

Volunteer Drive

Murfreesboro Drive

Completed

Hunley Court

Younger Drive

west end

Completed

North Wyatt Lane

Mexico Gravel Road

Thompson Road

Completed

Penn Terrace

Golden Bear Drive

east end

Completed

Creekwood Parkway

Penn Terrace

concrete

Rescheduled for 2020

Squire Circle

Lambeth Drive

east end

Completed

Lambeth Drive

Squire Circle

south end

Completed

South Drive

Oakland Gravel Road

east end

Completed

North Leisurely Way

Oakland Gravel Road

South Leisurely Way

Completed

South Leisurely Way

North Leisurely Way

North Leisurely Way

Completed

Spruce Drive

Oakland Gravel Road

east end

Completed

Hunter Lane

Quinton Court

East Smiley Lane

Completed

Quinton Court

East Smiley Lane

south end

Completed

Deerfield Drive

East Smiley Lane

Mary Ellen Drive

Completed

Blue Ridge Road

Providence Road

Gazelle Drive

Rescheduled for 2020

Newton Drive

East Leslie Lane

north end

Rescheduled for 2020


Sweeping is ongoing but excess chips on the roadway may be reported to the City’s Contact Center at 573.874.CITY (2489) or emailed to pubw@CoMo.gov.