City of Columbia Missouri

P.O. BOX 6015
COLUMBIA, MO 65205

FOR IMMEDIATE RELEASE

October 29, 2013

CONTACT: Columbia Public Works
(573) 874-7250

Sidewalk Closure in the 100 block of South 9th: November 1 - 29

(COLUMBIA, MO) -

Beginning Friday, November 1, at 7:00 a.m.  Steve Koirtyohann Construction will begin demolition of the existing building located at 114 S. Ninth Street.  This work will result in a closure of the sidewalk in front of 114 S. Ninth St. (east side of S. Ninth St. between Cherry St. and Locust St.).  Pedestrian traffic will be re-routed around the sidewalk closure by use of a pedestrian walkway through the existing parking stalls.  The work should be completed and the sidewalk fully reopened by Friday, November 29, by 7:00 p.m.

Motorists and pedestrians are urged to exercise extreme caution when in the construction area and use an alternate route whenever possible.



City of Columbia Vision
Columbia is the best place for everyone to live, work, learn and play.

City of Columbia Mission
To serve the public equitably through democratic, transparent and efficient government.

-30-